Four IPL group High Power Charger Foundations have been selected to install one high power EV charger and three rapid EV charger dispenser units within an existing forecourt in Worcester.
Designed to accommodate all manufactured and bespoke high power dispenser units, the IPL group Foundation System is modular in its design. It combines the STAKKAbox Modula Access Chamber with the RS219 Retention Socket to provide unrivalled flexibility when accommodating the bend radius of large power cables.
The system allows for civils work to be completed before the installation of EV dispensers, as cables can be pulled through ducting and stored within the Retention Socket. This also eradicated issues associated with conflicting time schedules. The foundations are fully future-proofed to allow for technological advancements and will facilitate the upgrading of the rapid dispenser units without any further civil works.